Generating timesheet entry suggestions

DMF 060364 PROJECTS TIMESHEETS TIMESHEET SUGGESTIONS

Suggestions for timesheet entries can be automatically generated for the displayed week, based on the events present in the employee’s Outlook calendar for the same week.

By default, timesheet entry suggestions are generated without assignments. However, if AI assignment prediction is set up from the Settings Portal, assignments can be predicted and specified automatically the for generated timesheet entry suggestions. Assignments are predicted based on previously completed and approved suggestions.

Reference

For more information about the setup of assignment prediction, refer to Setting up AI assignment prediction.

1 Display the desired week then click on for the desired day from the List, Table or Column display.
2 Click on at the right of the search field.

The generation of suggestions is started. Processing details can be accessed from the icon in the portal's upper bar.

Suggestions are marked with the icon. By default, the suggestion's Comment is the Outlook event title. The Outlook event description is displayed when hovering over the suggestion in List or Column view.

Reference

For more information about background tasks, refer to Upper bar.

Note

To prevent duplicates, no suggestions are generated from Outlook events created by the PlanningExchange batch.

3 If assignment prediction is set up and you have the DMF 060365 PROJECTS TIMESHEETS PREDICT ASSIGNMENTS FOR MY SUGGESTIONS, select the desired option from the popup in the top-right corner:
Option Description
Yes, search for assignments

Select this option to predict and automatically specify the assignments for the generated suggestions.

Important

Assignment prediction is based only on the history of previously completed and approved/rejected suggestions from past weeks. As a result, prediction accuracy will be limited during initial use but will improve over time as the user approves or rejects suggestions week after week.

Processing details can be accessed from the icon in the portal's upper bar. Suggestions with predicted assignments are marked with the icon. Assignments will remain blank and must be specified manually for suggestions where no matching history was found.

No, I will do it myself

Select this option to leave the assignments blank and specify them manually.

If this option was selected or the window was dismissed, assignments can be predicted later via the in the portal’s upper bar > corresponding task details > Predict assignments.

Suggestions without predicted assignments must be completed before they can be converted into timesheet entries.

Suggestions with predicted assignments can be directly converted into timesheet entries.

Reference

For more information about converting suggestions into timesheet entries, refer to Converting a suggestion into a timesheet.